Load in to load out, with cameras. Everything in the tier arriving at once, under time pressure, in somebody else's building.

4 lessons · 2 paper · 2 the room

Every lesson is read, then do, then check.

The check carries its answer underneath it. Look only after you have tried — the attempt is what teaches, not the answer.

Lesson 1 of 4The room · Needs real equipment · the Depot

Walk the room before you unload

Read
Where the power is, where the network socket is, where an audience will stand, where the sun will be in two hours. Ten minutes of walking saves an hour of moving things you have already rigged. The people who skip this are the people still working when the doors open.
Do
Walk a room plan and mark power, network, camera positions and the three places you must not put a cable.
Check

Why does where the sun will be matter indoors?

Lesson 2 of 4The room · Needs real equipment · the Depot

Rig, then test, then label

Read
Every camera gets rigged, every cable gets run, and then the whole chain gets tested end to end before anybody labels anything or coils anything neatly. Testing first means you are still able to reach things. Labelling second means you label what is actually there rather than what you intended.
Do
Set a two-camera show on the room plan, run the cables, then write the test order you would follow.
Check

Why label after testing rather than before?

Lesson 3 of 4Paper · Needs nothing but a pen

The last twenty minutes

Read
Doors open and the room changes: people block shots, the temperature rises, the light changes. The last twenty minutes before doors are for the things that cannot be done once there is an audience — focus, white balance, a final look at every camera on the multiview, and a safe shot ready on preview.
Do
Write your own twenty-minute checklist, in order, for a two-camera show.
Check

What is the last thing you should do before doors?

Lesson 4 of 4Paper · Needs nothing but a pen

Load out without losing anything

Read
Everything that came in goes out, in the same cases, in the same order, every time. Cables coiled the way they were coiled when you got them. The count happens before you leave the room, not in the van, and the recording is copied off the recorder before the recorder is packed.
Do
Write a load-out order for the show you rigged, with the recording copy step in the right place.
Check

When is the recording copied off?

For whoever is teaching it

Instructor notes

  1. This is the module that makes them hireable. Run it as a drill, not a discussion.
  2. Make the walk-the-room exercise real and time it. Ten minutes, clock running.
  3. The 'test then label' order is counterintuitive and correct. Expect an argument and let them have it.
  4. Load-out discipline is where gear gets lost and reputations get made. Be strict here.

Slide running order

What goes on the screen.

  1. A room plan with power, network and sun marked
  2. A cable run routed around the room
  3. A twenty-minute countdown checklist
  4. A load-out list with the recording copy highlighted

If you want more

Extra credit

  1. Write your own twenty-minute pre-doors checklist and keep it.
  2. Walk a room you know and mark every socket on a sketch.
  3. Time yourself coiling ten cables properly.